The count stays attached to the sheet
Every proposed detection is reviewed on its source sheet and approved or rejected there, so a quantity keeps a visible origin instead of becoming a bare number in a cell.
For estimators working out of a spreadsheet
A spreadsheet is an honest tool: it does what you typed. The trouble starts when the drawings change twice, two bids are due the same week, and the only record of why a number is what it is lives in the head of whoever typed it.
Not the arithmetic. Spreadsheets are very good at arithmetic. What breaks is everything around the number: where it came from, who checked it, and whether it survived the last revision.
Every proposed detection is reviewed on its source sheet and approved or rejected there, so a quantity keeps a visible origin instead of becoming a bare number in a cell.
Notes, cover sheet and specifications are read first, and the exclusions, allowances and RFIs they imply are proposed for your estimator to accept — rather than remembered, or not, at proposal time.
Approved quantities feed the line-item register, and adjusting a measurement recalculates the line item. No retyping between the takeoff and the price.
The proposal comes from the estimate under your branding, the approved exclusions print with the price, and the shareable link shows sell price only — verified as of October 2, 2026.
More than most software vendors will admit. The spreadsheet encodes how your company prices work, and that knowledge is yours, not the tool’s.
The questions we actually get
If one estimator covers your bid volume comfortably, you probably should not move yet, and we will say so on the call. The case for moving appears when volume outruns the estimator: when two bids land in the same week and one of them gets the fast read.
You start from the PDF plan set the GC sent and confirm the scale per sheet. There is no migration project standing between you and the first takeoff — you do not have to move the spreadsheet in before you can test whether this is better.
Because it does not get the last word. It proposes detections on the sheet they came from and your estimator approves or rejects each one. Where it is unsure, it flags the scope for human review instead of filling the gap with a guess.
No. The shared proposal link shows sell price only; your cost and margin stay with you. Verified as of October 2, 2026, and re-verified at every release.
Every proposed quantity is approved or rejected individually, and measurements are edited by hand on the drawing. Overriding is the normal workflow, not an exception path.
It covers counting, measuring, markup and the handoff into an estimate and a proposal, which for many specialty contractors is both of those. Where your current tool does something specific that this does not, we would rather tell you on the call than after you switched.
Book 30 minutes on one of your current bids. Nothing to send beforehand — the job you are pricing this week is enough.